Emergency Westinghouse Busway Duct Tap box

Emergency service outage needed to remove 20 feet of Westinghouse Busway Duct. We supplied a custom fabricated 4000A 480V Copper Cable Tapbox

UL – certified control panel for 12 exhaust fans

This panel controls 12 exhaust fans for a brake dust expulsion system in a subway transit tunnel. The panel distributes 480V power per fan

MCC Buckets for A Mission Critical Pharma Facility

A mission-critical pharma facility wanted to keep spare buckets in case of failure. We supplied 11 MCC buckets at adjustable amperage.

45kVA, 75kVA, and 500kVA Temporary Power Distribution Skids

These outdoor power distribution skids were custom manufactured at our facility in Hanover, MD with Hammond 45kVA, 75kVA, and 500kVA transformers.

Busway Plugs Reconditioning

A customer was able to save significant cost by using a reconditioned bus plug enclosure from our stock with a brand-new circuit breaker installed internally. Our reconditioning process is thorough and includes in-house powder coating capabilities.

Elevator Disconnects

A customer needed four elevator shunt trip disconnects immediately. Lead time from Bussman/Eaton was 4-5 weeks. We supplied our enclosed circuit breaker with shunt trip and auxiliaries in a pad-lockable

40 Years Old Pringle Switch Reconditioning

A local facility was powered by gear over 40 years old. When the pringle switch suffered damage on the C phase, the customer scheduled an outage for a week-long duration while the facility was closed.

16 transformers ranging from 45kVA to 500kVA

A customer was beginning a two-year job at a local healthcare campus. They needed over 16 transformers ranging from 45kVA to 500kVA. All units were stepping down 480V Delta to 120/208V Wye

3P 4000A 600V 200kAIC Eaton Magnum DSX

A customer needed a 3P 4000A 600V 200kAIC Eaton Magnum DSX draw-out circuit breaker to replace a unit that was creating

UL 891 Custom Switchboard For A Solar Farm

A solar farm in Winchester, Virginia needed 1600A outdoor switchgear and lead time was critical. The sooner they could get the gear on the ground, the sooner the farm could begin operations, driving revenue for the facility.